014Project: Merseyside Police Force HQ
Client: Willmott Dixon

Description:  Groundworks package consisting of earthworks, dealing with contaminated material and stoning up large areas (20 acre).  Extensive drainage package consisting of attenuation tanks, foul water treatment works and united utilities connections into highways and all surface water and foul water system.  Concrete bases and reinforced structural concrete.  Leading on from that will be a full hard landscape package and large car park/roads.

001 002 003 004 005 006 007 008 009 01001101217 IMG_5748 IMG_5732 IMG_5731

25 21 9 8 13

25038039 040 042 045 047 71